- 5/8'' White Raised Panel Doors, Thermofoil on MDF with 5 Years Warranty.
- 5/8'' White Melamine Cabinets with Full 5/8'' Back Panel
- Stainless Steel T-Bar Handles
- Laminate Countertop with 3'' Backsplash
- Includes 20''x 20'' Drop-in sink
This is a sample kitchen for an 8-foot wall with an 8-foot ceiling.

- 3/4'' Melamine Doors with 5 Years Warranty.
- 3/4'' White Melamine Cabinets.
- Black T-Bar Handles
- Laminate Countertop with 3'' Backsplash
- Includes 20''x 20'' Drop-in sink
This is a sample kitchen for an 8-foot wall with an 8-foot ceiling.


High-Quality Cabinets

Variety of Style

Countertops
For All Budgets

Exceptional Value & Service
Frequently asked questions
- 01
KitchensForLess designs, builds & installs custom kitchens across the GTA, combining lifelike 3D design previews with experts installers and full project management.
- 02
A compact 10-ft galley kitchen starts around $2,700–$3,000, including cabinets, sink, quartz-look laminate countertop, delivery, and installation. Condo or town-home kitchens with real quartz counters generally run $6,000–$10,000. Medium kitchens in detached houses average $10,000–$15,000, while large, high-end spaces range from $15,000 to $30,000+. Sample projects and prices are shown on our home page. All figures include cabinetry, hardware, countertop, sink, delivery, and professional installation. Extra costs—demolition, plumbing, electrical, drywall, flooring, and paint—depend on layout changes and permit needs. KitchensForLess coordinates every trade and provides a detailed, line-item quote so you can decide exactly how to proceed.
- 03
Fast-track kitchens (ready-made cabinets, no layout changes)
Cabinet delivery: In-stock RTA or pre-assembled lines can arrive within one week of deposit.
Installation: Our crew sets the entire kitchen in one working day.
Countertops:
Laminate worktops are fitted the same day.
Quartz requires templating and fabrication, so add 5 – 7 days.
Total timeline
With laminate: delivery + one-day install
With quartz: one-day install plus ≈ 1 week for the stone.
*Installation date depends on our schedule, please call to confirm.*
Custom or layout-changed kitchens (mid-size to large)
Cabinet fabrication: Custom boxes and doors typically take 2 – 3 weeks after final sign-off.
On-site work: Demolition, rough-ins, tile, cabinet installation, countertops and backsplash span is approximately 2-3 weeks.
Overall window: Deposit-to-completion is usually 3 – 5 weeks, and your cooking zone is out of service only during the final 2-3 weeks.
Larger designer projects: Timelines extend if walls move or permits are required.
We understand you need your kitchen back quickly, so we schedule demolition only after every trade and material is lined up. Once we start, our crew is on-site every day until the job is finished.
- 04
In Toronto you must pull a permit if you move or add walls, especially load bearing walls, relocate plumbing, modify electrical service, or change window/door openings.
New flooring and new cabinets don't need one.
- 05
Minor mid-range kitchen updates recoup ≈86 % of cost at resale—the highest payback of any interior reno category in the latest Cost-vs-Value study.
- 06
Toronto homeowners are gravitating toward warm wood tones, bold statement-stone slabs, and refined “quiet-luxury” palettes—hallmarks of the 2025 move toward natural materials and rich textures.
Shaker-style cabinet doors remain the perennial favourite, with slim-shaker variants and clean slab fronts close behind as minimalist profiles dominate local trend reports.
- 07
Spring projects let you enjoy the new kitchen by summer, but off-peak fall-winter slots often mean faster permits and better availability.